Pipeline Atlantic Coast

TGI operates in the Atlantic Coast the following transport pipelines embedded within the Promigas transport system:

 

Atlantic Coast pipelines

 

Tabla

 

RIOHACHA MAICAO PIPELINES

It Starts in the derivation located at Km 27 +700's of Ballena Barranquilla -owned Promigas pipeline and ending with the receiving station of Maicao downsream shutting valve that delivers to the system of Gases de la Guajira company.

Length: 71,936 km.

Diameter: 3 "

Aerial / Underground : Underground

Coating: Hard coal tar with fiberglass.

Cathodic Protection: sacrificial anodes.
Rights of track: Own.
Clients: Gases of Guajira. Maicao (home distribution).
Measurement: 3" Turbine (Maicao station).
Branches: No
Gas: Guajira (320,000 scf / day).
Construction Year: 1990.


POZOS COLORADOS – ARACATACA PIPELINE

It starts at the premises of the derivation of Km 221 +279's Bureche - Pumarejo Bridge pipeline and ends into the receiving trap of delivery to the Aracataca branch.

Length: 50,147 km.
Diameter: 10."
Thickness: 0,219."
Aerial / Underground: parcially underground

Coating: Hard coal-tar enamel.

Cathodic Protection: electrical Current Km 24 +720

Rights of track: Own.

Clients: Gases del caribe, Gradesa, Riofrio, La Gran Vía, Orihueca, Sevilla, Guacamayal, Aracataca and Fundacion. (home distribution) (

Gas: Guajira (1,270,000 scf / day).
Construction Year: 1966. (Use original poliduct).

 

ISABEL LOPEZ – SABANALARGA PIPELINE

It starts in the derivation located at Km 36 +565's Cartagena , Barranquilla pipeline (Promigas), and ends in a block valve installed downstream of the filter of the measurement station in Sabanalarga.

Length: 9.15 km.
Diameters: 3. "
Thickness: 0,216. "

Aerial / Underground: underground

Coating: Hard coal-tar enamel.
Cathodic Protection: sacrificial anodes.
Rights of track: Own.
Clients: Gases del Caribe. Sabanalarga (home distribution)
Measurement: Rockwell 10000. (Owner: PROMIGAS S.A. ).
Branches: No.
Gas: Guajira (198,000 scf / day).
Construction Year: 1984.



ATUNES – CORELCA PIPELINE

It starts in front of the Thermalelectric Plant of Cospique downstream of the sections Valve of 10", takes the platform of the road to Mamonal right bank sense and crosses the road to the beginning of Atunes of Colombia, stay on the left bank until k 2 +500 where the road crosses the load up corridor and re-crossing the road before k 3 +000, continuing until reaching Termocartagena. The pipeline ends at the upstream valve flange cutting into the delivery registration box of TermoCartagena.

Length: 3.2 km.
Diameter: 10."
Aerial / Underground: underground

Coating: Hard coal-tar enamel.
Cathodic Protection: Electrical Current.
Rights of track: Own.
Clients: Surtigas, T. Cartagena Cellux, Biofilm, Bioaise, Polibol, Shrimp, Atunes-Col. , Colclinker. (Industrial distribution)
Branches: No.
Gas: Guajira (60,000,000 scf / day).



LA HEROICA – MAMONAL PIPELINE

Starts in La heroica station and ends in the Mamonal station, both owned by Promigas. The Rights of Track is flat and does not cross important water bodies.

Length: 7,298 km.
Diameter: 20. "
Thickness: 0,312. "
Aerial / Underground: underground

Coating: Hard coal-tar enamel.
Cathodic Protection: Electrical Current.
Rights of track: sections shared with 12" poliduct and 39" aqueduct
Clients: Bidirectional Interconnection of Ballenas -- Cartagena pipeline and Jobo - Cartagena pipeline
Measurement: Ultrasonic. (Owner: PROMIGAS S.A. ).
Branches: No.
Gas: Guajira.



GÜEPAJE - SINCE - COROZAL Y SAN PEDRO PIPELINE BRANCH

The pipeline starts in Güepajé Field in the Flange after the measurement system and ends in the Piñalito station of TGI S.A. E.S.P. The rights of track are undulated without strong slopes.

The other pipeline of this district starts in the derivation valve located at Km 8 +120's pipeline Guepajé - Corozal, and ends at the City Gate of San Pedro.

Length: 45 Km.
Diameter: 8. "
Thickness: 0,322. "
Aerial / Underground: Underground until PK 33 + 500.
Coating: Hard coal-tar enamel.

Cathodic Protection: Electrical Current.
Rights of track: Güepajé-Sincé: Own.
Sincé-Corozal: Shared
Users: Surtigas S.A. (San Pedro, Betulia, Since, Corozal.) domiciliary gas.
Branches: San Pedro Since, Betulia.
Gas: Güepajé (9,800,000 scf / day).
Construction Year: 1993.


JOBO - EL LLANO PIPELINE

Starts in El Jobo station in the flange upstream from the pig trap located at Cerromotoso site and ends at the town of El Llano . The rights of track is undulating without strong slopes.

Length: 17 Km.
Diameter: 6. "
Thickness: 0,280. "
Aerial / Underground: Underground

Coating: Poliken.
Cathodic Protection: None
Right track: Own.
Clients: San Marcos (domiciliary gas).
Measurement: Rockwell 10000 (Owner: SURTIGAS S.A. )
Gas 76,000 scf / day.
Branches: No.
Construction Year: 1977.

 

For more information, contact

webmaster@tgi.com.co

Transportadora de Gas Internacional S.A E.S.P
URL: http://www.tgi.com.co - Email: webmaster@tgi.com.co
Cra 34 No. 41-51 - 6320002 - 6325525
Bucaramanga - Colombia